Project Idea:
This embedded system project optimizes energy usage by detecting human presence in a room using IR sensors. It automatically turns electrical loads ON when people enter and OFF when the room is empty. A microcontroller-based counter tracks the number of people inside, displaying the count on a 7-segment display. Perfect for learning automation and energy conservation concepts.
Components:
8051 Microcontroller
Voltage Regulator IC
Crystal Oscillator
Resistors & Capacitors
Transistors & Diodes
PCB & Breadboard
IR Transmitter & Receiver Modules
LED & Lamp
Transformer/Adapter
Push Buttons & Switch
IC & IC Sockets
Cables & Connectors
Project Features:
Automatic ON/OFF load control based on occupancy
People counting using dual IR sensor pairs
Real-time display on 7-segment display
Energy-saving automation
Demonstration with a lamp as load
Embedded C code with Keil Compiler support
Applications:
Smart classrooms and labs
Office meeting rooms
Library automation
Home automation systems
Industrial energy conservation
📦 Project Includes:
Fully assembled and tested circuit
Circuit diagram
Source code
(For DIY KITs - only the components will be provided)
Project Types:
- DIY KIT(Do IT YourSelf KIT) - We are providing only components in this kit for this project
- DIY KIT with Code & Circuit Connections - Along with the components, you will get the Code and the Circuit Connections file to help you build the project easily.
- Readymade Breadboard - We are providing fully assembled, tested and ready-made project using plug-n-play jumper wires and breadboard with all the other components, code & circuit diagram.
- Readymade Soldered - We are providing fully assembled, tested and ready-made project soldered on a PCB with all the other components, code & circuit diagram.
Dimensions:
Approx. 20 cm(L) × 15 cm(W) × 8 cm(H)
Shipping dimensions:
length: 25cm
width: 20cm
height: 10cm
Weight:
~500 grams
Estimate project weight:(approx)
2kg
Notes: All the products are made by LearnElectronics India and not for re-sale.
Efficient Power Manager Project
- Order Processing Time:
- After processing, the development of your project will begin. We require a minimum of 10-15 days to complete and prepare your project for shipment. However, please note that the delivery time is an estimate and may vary depending on project complexity and component availability.
- All project orders are processed within 2-3 business days after payment confirmation.
-
Delivery Timeframe:
- While we strive to deliver your project within the specified timeframe, there is no guaranteed delivery date. The actual delivery time may be shorter or longer depending on various factors, including shipping delays, customs clearance, and unforeseen technical challenges.
- We will keep you informed of your project's progress and provide updates on the estimated delivery time as needed.
-
Shipping and Delivery Charges:
- Delivery charges are additional and are not included in the project price. The shipping cost will be calculated at checkout based on your location and the chosen shipping method.
- Customers are responsible for any customs duties, taxes, or fees that may be applicable in their country.
-
Order Cancellations:
- Due to the customized nature of our projects, orders can only be canceled within 24 hours of placement. After this period, the order is non-cancellable as work will have already begun.
-
Returns and Refunds:
- As these are custom-built projects, we do not accept returns or offer refunds unless the project is defective or significantly not as described.
- If there are any issues with your project upon delivery, please contact us within 7 days to resolve the matter.
-
Technical Support:
- We provide basic technical support for the first 30 days after delivery to help you set up and operate your project.
- Extended support and customization services are available at an additional cost.
-
Disclaimer:
- We are not responsible for delays caused by external factors beyond our control, including but not limited to shipping carrier delays, natural disasters, or government restrictions.
- By placing an order, you agree to the terms and conditions outlined in this policy.
- Order Processing Time:






